Resources

A resource is what does the work: a machine, a booth, a workshop, an asset, a person. Each task occupies one or more resources for its duration.

Field What it is Example
Name Identifier of the resource Cutting 2
Resource type The family it belongs to; defines which properties it has Cutter
Plant Where it is; plants can have levels (plant, line) Plant A
Capacity How many tasks it can do at once 1 (a machine), 3 (a workshop with three bays)
Properties Values specific to the resource, according to its type speed, maximum load, certifications

A resource type groups equivalent resources and defines their properties. Tasks can ask for “any resource of type X”, “this specific resource” or “any resource that meets a condition” (see alternatives).

  • Groups: named sets of resources, for example “Lathes” or “Morning shift technicians”. A task can ask for a resource from a group.
  • Hierarchy: location levels, such as plant → line. Used for rules such as “all phases of an order in the same plant” (same unit constraint).

Known stoppages (maintenance, public holidays, an already recorded breakdown) are represented as fixed blocks on the resource: they take up its capacity and the rest of the plan is placed around them.